View Single Post
Old 08/01/2021, 06:31 PM   #204
karimwassef
Registered Member
 
karimwassef's Avatar
 
Join Date: May 2004
Location: Dallas, TX
Posts: 11,033
The cement needs to cure for 30 days before I can apply the epoxy layers. It's a heavy solids 2 part epoxy. Three layers on top of two precoats.

I have one last thing to do though - I need to chip a little groove around the reef sump to tank PVC connections and seal them. It's another measure to make sure there's no surface leakage around the PVC. I have the concrete hammer to do it - just need to do it and it's hot in Texas.


__________________
Failure isn't an option It's a requirement. 660g 380inwall+280smp/surge S/L/Soft/Maxima/RBTA/Clown/Chromis/Anthias/Tang/Mandarin/Jawfish/Goby/Wrasse/D'back. DIY 12' Skimmer ActuatedSurge ConcreteScape
karimwassef is offline   Reply With Quote